The Austrian Recovery and Resilience Plan was submitted to the European Commission on April 14th. The European Commission has adopted a positive assessment of Austria's recovery and resilience plan on 21 June 2021. Large parts of the RRP were already presented in last year’s governmental program (2020-2024).

Initial assessment and trends

With an overall volume of € 4.5bn, equaling 1.2% of Austrian’s GDP (2020), we find that Austria’s recovery plan (RRP) achieves a green spending share of 34% (below the EU’s 37% benchmark) and no measures have a negative impact. Trade unions, social partners and environmental groups have criticized the lack of consultancy and transparency in the development process of the RRP.

Last Update:
22/11/2021
Short Assessment
Belgium
Online
€5.917.758.543
Total Funding

Current status of RRP at national level

The government of Belgium published the final version of its National Recovery and Resilience Plan (RRP) on April 30th 2021. The European Commission has adopted a positive assessment of Belgium's recovery and resilience plan on June 23rd. Belgium is set to receive a total of €5.9bn through the EU Recovery and Resilience Facility (RRF).

Initial assessment and trends

Our analysis shows that overall, the investments envisaged by Belgium can make a very positive contribution to the green transition.

Last Update:
15/07/20
Short Assessment
Bulgaria
Online
€7.099.394.383
Total Funding

Current status of RRP at national level

A broad draft plan was presented on 30th of October. A second draft was sent to the Commission on 20 January, the final plan was submitted in October 2021. Bulgaria has requested a total of €6.6 billion in grants under the RRF.

Initial assessment and trends

The Bulgarian RRP was developed by an inter-ministerial working group. The plan was presented at the end of October for a public consultation. It is still unclear how the results of the public consultation are integrated into the amendment of the draft plan. Our full analysis shows that Bulgaria's draft RRP nonetheless makes a positive contribution to the green transition.

Last Update:
22/11/2021
Short Assessment
Czech Republic
Online
€7.852.000.000
Total Funding

Current status of RRP at national level

In May 2021, after a contentious process, the Czech government adopted the national Recovery and Resilience Plan (RRP), with significant changes relative to previously released drafts. Throughout the process, civil society actors have criticized the lack of opportunities for effective participation. The European Commission has adopted a positive assessment of Czechia's recovery and resilience plan on 19 July 2021. The plan includes a total of €7 billion in grants under the Recovery and Resilience Facility (RRF).

Initial assessment and trends

Our analysis shows that the measures included in the plan, with investments of €7.9bn, can make a positive contribution to the green transition, though there are several specific shortfalls.

Last Update:
22/11/2021
Short Assessment
Estonia
Online
€979.000.000
Total Funding

Current status of RRP at national level

On March 5, the Estonian government published the planned allocation of recovery funds through the EU Recovery Facility to different measures, along with rather brief and general descriptions of the measures, but not a full Recovery and Resilience Plan. An updated version of this overview was released in May 2021. A week of public consultations for selected measures that took place in March 2021 only provided little additional information. The European Commission has adopted a positive assessment of Estonia's recovery and resilience plan in October 2021. The plan includes a total of €969.3 million in grants under the Recovery and Resilience Facility (RRF).

Initial assessment and trends

Overall, we find that the planned measures, with investments of €1.0bn (4% of Estonia’s GDP (2019)), can make a positive contribution to the green transition, though more information on the specific implementation of the measures will be necessary for a final assessment.

Last Update:
22/11/2021
Short Assessment
Finland
Online
€2.075.000.000
Total Funding

Current status of RRP at national level

The government published a draft version for the RRP ("Sustainable Growth Programme") on 15/03/21, but aims to publish a final version at the end of April. According to the plan, 50% of the funds will be allocated to support the green transition. There will be no additional big economic stimulus package apart from this RRP-package using the RRF money. The European Commission has adopted a positive assessment of Finland's recovery and resilience plan on 4 October 2021. The plan includes a total of €2.1 billion in grants under the Recovery and Resilience Facility (RRF).

Initial assessment and trends

The RRP is embedded in an overall progressive and green strategy for the country's future. Overall, our analysis finds that Finland’s recovery measures have the potential to make a very positive contribution to the green transition.

Last Update:
22/11/2021
Short Assessment
France
Online
€101.048.400.000
Total Funding

Current status of RRP at national level

In September 2020, France presented a €100bn domestiv recovery package (called 'France Relance'). The final Recovery and Resilience Plan (RRP) for EU funding was presented on 27 April 2021. The European Commission has adopted a positive assessment of France's recovery and resilience plan on 23 June 2021. The plan includes a total of €39.4 billion in grants under the Recovery and Resilience Facility (RRF). In August 2021, the European Commission has disbursed €5.1 billion to France in pre-financing, equivalent to 13% of the country's financial allocation under the RRF.

Initial assessment and trends

Overall, the French programme makes a moderate contribution to the transition towards a climate neutral economy, achieving a green spending share of just 19% according to our analysis. The analysis of the RRP in the context of the EU Recovery Facility shows a green spending share of 29%, below the EU’s 37% benchmark.

Last Update:
22/11/2021
Short Assessment
Germany
Online
€140.303.088.000
Total Funding

Current status of RRP at national level

Germany presented a €130bn domestic recovery package in the summer of 2020, the first EU state to do so. In December 2020, the government published a draft RRP, which mostly includes measures that were already included in the previous domestic recovery package. In January 2021, the European Commission criticized the government for a lack of additional ambition especially with regards to reforms in its draft RRP. On April 27, Germany presented its final RRP. The European Commission has adopted a positive assessment of Germany's recovery and resilience plan on 22 June 2021. The plan includes a total of €25.6 billion in grants under the Recovery and Resilience Facility (RRF). In August 2021, the European Commission has disbursed €2.25 billion to Germany in pre-financing, equivalent to 9% of the country's financial allocation under the RRF.

Initial assessment and trends

Overall, the German programme makes a moderate contribution to the transition towards a climate neutral economy, achieving a green spending share of just 21% according to our analysis. Furthermore, it is problematic that the German government seeks to simply refinance previously planned measures through its RRP, rather than using it to enable additional projects and reforms, with only around one third of the RRP's funds being used to finance new projects.

Last Update:
22/11/2021
Short Assessment
Greece
online
€32.000.000.000
Total Funding

Current status of RRP at national level

The Greek Recovery and Resilience Plan (RRP) was officially submitted to the European Commission on 27 April 2021, but only a summary version has been released to the public, the final plan was adopted by the European Commission, in June 2021.

Initial assessment and trends

Overall, Greece’s recovery measures have the potential to make a moderate contribution to the green transition. We find that Greece’s final recovery plan (RRP) achieves a green spending share of 14% (including Grant and Loan component), whereas the RRP incl. Grants only achieves a green spending share of 24%. The loan component (€12.5bn) is used for passing on guarantees and concessional finance to the private sector. Though the government published a guidance on how to channel this into green investments, it is not assessable yet to which extent these investments will contribute to climate mitigation.

Last Update:
16/12/2021
Short Assessment
Hungary
Plan available, analysis online
7.174.000.000
Total Funding

Current status of RRP at national level

The final Recovery and Resilience Plan was submitted to the Commission on the 11th of May 2021, and officially published only on the 17th of May. Hungary has requested a total of €7.2 billion in grants under the RRF. The plan has not been endorsed yet by the European Commission.

Initial assessment and trends

Civil society actors criticized that the process around the development of the plan was very opaque, lacking transparency. Overall, we find that the Hungarian recovery plan (RRP) achieves a green spending share of 37% (equal to the EU’s benchmark). The Plan includes a number of good measures e.g. for increasing the share of renewable energy in final energy consumption. However, the Hungarian RRF does not adequately support energy efficiency in the building sector. While the plan looks strong on climate-spending, the positive impact of the green investments set out will depend heavily on the funds being effectively disbursed in line with principles of good governance and to those entities who are best capable of delivering the respective services in the public interest.

Last Update:
22/11/2021
Short Assessment
Italy
Online
€234.850.000.000
Total Funding

Current status of RRP at national level

The final Italian Recovery and Resilience Plan (RRP) was presented by Prime Minister Draghi on 27 April 2021, after disagreements over an earlier version of the plan led to the dissolution of the previous government. The European Commission has adopted a positive assessment of Italy's recovery and resilience plan on 22 June 2021. The plan includes a total of €191.5 billion, €68.9 billion in grants and €122.6 billion in loans under the Recovery and Resilience Facility (RRF). In August 2021, the European Commission has disbursed €24.9 billion to Italy in pre-financing, equivalent to 13% of the country's grant and loan allocation under the RRF. Italy is one of the first countries receiving a pre-financing payment under the RRF.

Initial assessment and trends

Overall, Italy’s recovery measures fall short of the green transition potential of the recovery funds available. While the plan includes investments into measures that are relevant to the green transition, there is a significant imbalance in the allocation of funds between sectors and activities. Many of the green investments in the plan are only likely to bring about an incremental shift towards a climate neutral economy and look fairly insignificant relative to the needs of an economy-wide transition to climate neutrality.

Last Update:
22/11/2021
Short Assessment
Latvia
Online
€1.650.000.000
Total Funding

Current status of RRP at national level

The draft recovery plan was published on January 27th, with a public consultation running until the 9th of March. The European Commission has adopted a positive assessment of Latvia's recovery and resilience plan (€1.8 billion in grants) on 22 June 2021. In September 2021, the European Commission has disbursed €237 million to Latvia in pre-financing, equivalent to 13% of the country's financial contribution as established in the Council Implementing Decision.

Initial assessment and trends

Our full analysis shows that the measures included in Latvia's draft RRP make a moderate contribution to the green transition, falling short on ambition overall.

Last Update:
22/11/2021
Short Assessment
Poland
Online
€35.970.000.000
Total Funding

Current status of RRP at national level

After completing a consultation on the draft originally presented on February 26, 2021, the Polish government submitted its National Recovery and Resilience Plan (RRP) to the Commission on April 30, 2021, while at the same time requesting another month for additional modifications before the European Commission launches its official assessment. Poland has requested a total of €23.9 billion in grants under the RRF and €12.1 billion in loans. The plan is not endorsed yet by the European Commission.

Initial assessment and trends

Our analysis shows that overall, the investments envisaged by the plan can make a positive contribution to the green transition. However, while the RRP includes measures that have the potential to fast-track and scale-up decarbonization efforts, the lack of detail and the lack of tangible targets attached to the measures proposed make it impossible to say whether the plan will be able to fully realize that potential and to what extent it will contribute to the EU climate policy targets.

Last Update:
22/11/2021
Short Assessment
Portugal
Online
€16.645.000.000
Total Funding

Current status of RRP at national level

Portugal was one of the first EU countries to submit its draft RRP to the Commission, in October 2020. These recovery measures are complemented by a domestic Investment Program, which also draws on the EU's long-term budget. An updated version of the plan was presented in February 2021, and the final RRP submitted in April 2021. The European Commission has adopted a positive assessment of Portugal's recovery and resilience plan on 16 June 2021. The country is set to receive €16.6 billion in total over the lifetime of its plan (€13.9 billion in grants and €2.7 billion in loans). On 3 August 2021, the European Commission has disbursed €2.2 billion to Portugal in pre-financing, equivalent to 13% of the grant and loan component of the country's financial allocation.

Initial assessment and trends

Overall, Portugal’s recovery measures have the potential to make a positive contribution to the green transition depending on their implementation. Positive measures include investments into industrial decarbonization, public transport, and energy efficiency. At the same time, the plan includes some problematic investments, especially in road infrastructure, and has been criticized for this by the European Commission. Lastly, it includes many measures whose climate mitigation effect cannot yet be assessed and depends on their implementation, such as investments into new housing projects and industrial development. Notably, the draft RRP does not offer many concrete links between its projects and the broader agenda of the 2030 National Investment Plan or wider climate policy goals.‍

Last Update:
22/11/2021
Short Assessment
Romania
Online
€41.143.000.000
Total Funding

Current status of RRP at national level

A first draft of the Plan was published in November 2020 and is currently being revised. The second version of the Plan was published in March 2021. The public debate around the Plan, launched on March 19th, has been scarce. The European Commission has adopted a positive assessment of Romania's recovery and resilience plan on 27 September 2021. The plan entails activities totaling €29.2 billion (€14.2 billion in grants and €14.9 billion in loans).

Initial assessment and trends

Overall, Romania’s recovery measures make a positive contribution to the green transition, although the ultimate contribution of the recovery measures cannot yet be fully assessed as public versions of the RRP lack details on the design of specific recovery measures beyond the overarching elements of the plan.

Last Update:
22/11/2021
Short Assessment
Slovakia
Online
€6.155.000.000
Total Funding

Current status of RRP at national level

The first complete draft of Slovakia’s Recovery and Resilience Plan (RRP) was published on 8 March 2021, and the final RRP was submitted to the European Commission on 29 April 2021. The European Commission has adopted a positive assessment of Slovakia's recovery and resilience plan (€6.3 billion in grants) on 21 June 2021.

Initial assessment and trends

Overall, we find that the measures included in the draft plan, with investments equaling 6.5% of Slovakia’s GDP (2019), are likely to make a positive contribution to the green transition. The Slovak RRP includes a “Green Economy” category with five components, which include many promising measures, such as investments in energy efficiency, renewable energies, and industry decarbonization. However, there are still areas of concerns, such as support for fossil gas boilers included in the energy efficiency pillar. Furthermore, while the plan’s exclusion of support for fossil power generation is in line with EU green transition requirements, the €220m allocated to renewable energy generation are insufficient to fully exploit the potential of renewables for a green recovery, especially after years of legal restrictions on the expansion of renewables. The actual effect of the plan thus depends on whether its implementation will be accompanied by other measures, and whether there will be additional reforms to align national planning with the target of climate neutrality by 2050. Lastly, given Slovakia’s relatively poor track record in using EU funds, ensuring the outlined measures are implemented successfully may be a challenge in itself.

Last Update:
22/11/2021
Short Assessment
Slovenia
Online
€2.479.908.624
Total Funding

Current status of RRP at national level

The Slovenian government presented its recovery plan (RRP) for the €2.5bn in grants and loans that it will receive through the EU Recovery and Resilience Facility (RRF) at the end of April 2021. The European Commission has adopted a positive assessment of Slovenia's recovery and resilience plan on 1 July 2021, a key step paving the way for the EU to disburse €1.8 billion in grants and €705 million in loans under the RRF. On 17 September 2021, The European Commission has disbursed €231 million to Slovenia in pre-financing, equivalent to 13% of the country's grant allocation under the Recovery and Resilience Facility (RRF). Civil society actors and the public had little opportunity to participate in the development of the plan.

Initial assessment and trends

Our analysis shows that most measures in the RRP do not contribute to a greener transition in the long run. The explanation in the plan on avoiding significant harm is perceived as weak. The plan includes some positive measures, for instance on energy efficiency and railways, but these are undermined by problematic measures in other areas.

Last Update:
22/11/2021
Short Assessment
Spain
Online
€69.528.000.000
Total Funding

Current status of RRP at national level

The government presented ten priorities for its recovery plan in October 2020. A full recovery plan has been published on 13.04.21. The European Commission has adopted a positive assessment of Spain's recovery and resilience plan (€69.5 billion in grants) on 16 June 2021. On 17 August 2021, the European Commission has disbursed €9 billion to Spain in pre-financing, equivalent to 13% of the country's financial allocation under the Recovery and Resilience Facility (RRF).

Initial assessment and trends

Overall, we find that the components included in the draft plan, with investments totaling €69.5bn, equaling 6.2% of Spain’s GDP (2020), will make a positive contribution to the green transition. However, despite the inclusion of many positive investment and reform priorities in the plan, the information provided on which exact measures will receive specific funding amounts is often insufficient for a fully comprehensive assessment. All in all, the RRP sets positive benchmarks through the connection of investments and reforms such as the introduction of more ambitious energy transition targets enabled through recovery funding, as well as with the support of specific flagship projects as part of the green transition, such as battery manufacturing.

Last Update:
22/11/2021
Short Assessment
Ireland
No assessment planned
Total Funding
No items found.

Current status of RRP at national level

The Irish government opened a public consultation on its recovery plan on February 2nd, but did not provide any information on the government's own priorities or plans for using the funds. The European Commission has adopted a positive assessment of Ireland's recovery and resilience plan on 16 July 2021. The plan includes a total of €989 million in grants under the Recovery and Resilience Facility.

Initial assessment and trends

Last Update:
22/11/2021
Short Assessment
Netherlands
No assessment planned
Total Funding
No items found.

Current status of RRP at national level

No official RRP has yet been submitted to the EU Commission, nor are any drafts publicly available.